Provision of Engineering, Procurement and Supply, Installation, Assembling, Testing and Commissioning of power equipment |
Perform required Design and Engineering, procurement and Supply, installation, assembling, testing and commissioning of Fire Exhausting System “Smart Ventilation”, Power Transformers 133/32 KV, K-250 & K-500 Compressors. The entire supply and Works shall be carried out according to Technical Requirements, Data Sheets and Project Plans and Procedures produced by the client |
EPCC |
Provision of Engineering, Procurement, Construction, Testing and Commissioning of Al Dhabbiyah construction man camp |
Provide all resources and equipment to perform all surveying and engineering, general earth works, security fence construction, water and sewage network & system, fire fighting and irrigation system, power generation and systems, IT and telecom system, living units installation, erecting of office, dining, recreation, clinic, warehouse…facilities |
EPCC |
Provision of Engineering, Procurement & Supply, Installation, Assembling and commissioning of power equipment for Az-Zour North Power Station |
Perform required Design and Engineering, Procurement and Supply, Installation, assembling, Testing and Commissioning of Turbine blades for SST-300, Control System Heat Exchange Units, Spare parts for SST-300 Siemens Turbines, Blades for Alstom GT 13E2M, all Works shall be carried out according to Technical Requirements, Data Sheets and Project Plans |
EPCC |
Provision Turn key Lump Sum project of Engineering, Procurement, Construction and Commissioning of RAS construction personnel camp |
Work comprise of surveying, engineering, procurement, construction, installation, testing and commissioning of various activities including earth works, security fence, water and sewage network & system, fire fighting and irrigation system, power generation and systems, IT and telecom system, living units installation, erecting of office, dining, recreation, clinic, warehouse…facilities |
EPCC |
Provision of Installation, construction, testing & commissioning of 6” Flow lines 12” and 2 6” Inter-Field Trunk lines, D-Field |
Provide needed tools, equipment and laborer’s to perform the installation stringing, ditching, bedding, welding, coating, wrapping, back filling, cathodic protection works, hydro testing, marker posts and commissioning of 6” dia X42 Pipeline (Inter-Field Trunk lines), 6” dia X42 Pipeline (Flow lines), 12” dia X52 Pipeline (Inter-field Trunk lines), 6” dia X42 (Flow lines) in D Field. |
PCC |
Provision of Procurement, Installation, Construction and Commissioning of 18″ trunkline, D-field to NC-186 |
Provide required Tools, Equipment, Materials and Workforce to perform surveying and routing, when needed designs, procurement, construction, erecting and Installation of 25km, 18” carbon steel oil trunkline pipes, pig launcher and receiver, sump tanks, Cathodic Protection system and chemical injection unit. |
PCC |
Provision of fixed Lump Sum project of Engineering, Procurement, Construction and Commissioning of Ruwais construction man camp |
Work comprise of surveying, engineering, procurement, construction, installation, testing and commissioning of various activities including earth works, security fence, water and sewage network & system, fire fighting and irrigation system, power generation and systems, IT and telecom system, living units installation, erecting of office, dining, recreation, clinic, warehouse…facilities |
EPCC |
Provision of Engineering, Procurement, Construction & installing, Commissioning of 18” trunk line, I/R field to NC-115 |
Provide required tools, equipment, materials and workforce to perform all surveying, pipe routing, engineering and designing, supplying and procurement, installation and construction, testing and commissioning of all piping and associated items and materials, earth and civil works, laying and welding, coating and wrapping, E&I works of I/R field to NC-115, 18” oil trunk line |
EPCC |
Provision of Turnkey project for the Engineering, Procurement, Construction, Testing and Commissioning of Khazzan construction personnel camp |
Work comprise of surveying, engineering, procurement, construction, installation, testing and commissioning of various activities including earth works, security fence, water and sewage network & system, fire fighting and irrigation system, power generation and systems, IT and telecom system, living units installation, erecting of office, dining, recreation, clinic, warehouse…facilities |
EPCC |
Provision of Engineering, Procurement, Construction and Commissioning of wells Tie-In for 5A-04, 5A-06, BB-13 and BB-14 to Manifold at Faregh Main Station |
“Provide required tools, equipment, materials and workforce to perform all surveying, engineering, procurement, construction, pre-commissioning and commissioning of provided facilities at the four wellhead wing valves, including 4” Carbon Steel SSV (surface shutdown valve), choke valve, connecting spool pipes, part-way and insulated section warning tape, valve and fittings for each well…Seven slots which is equipped with motor operated valves (MOV) to control opening and closing from control room (DCS) and the well head panels complete with hydraulic safety panels” |
EPCC |
Provision of Engineering, Procurement & Supply, Installation, Construction and Commissioning of 133/32KV power transformers |
Perform required Design & Engineering, Procurement & Supply, Installation, Assembling, Testing and Commissioning of Power Transformers 133/32 KV produced by approved manufacturers ABB or Siemens and in accordance with the Technical Requirements, Data Sheets and Project Plan provided by the client |
EPCC |
Lump Sum Turnkey for the provision of Engineering & Design, Procurement & Supply and Construction of SOOTBLOWERS |
Design, Supply and Construction of SOOTBLOWERS and Associated Elements of HCU Reactor Feed Heater H014-01, HCU Fractioned Feed Heater H014-051 and HDS Reactor Charge Heater H051-01, to be installed at the Hydro processing Project, as part of Khabrovsk Refinery |
EPCC |
Provision of Engineering, Procurement & Supply, Installation, Construction and Commissioning of pumps and pumping equipment for Gas Turbine Station (GTS) |
Perform required Design and Engineering, Procurement and Supply, Installation, assembling, testing and Commissioning of of ANDLITZ pumps 9120 m3/hr, Supply of pumping equipment (fittings, pipes, elbows and etc.), according to Technical Requirements and Data Sheets produced by Siemens, which is an integral part of this Contract. |
EPCC |
Engineering, procurement, construction and commissioning of Jurf Al Nadaf chilled and frozen ware house |
Work comprise of designing activities, construction of required foundations and slabs, construction of the steel structure chilled and frozen ware house, installation of the cooling and freezing system, construction of required mechanical and electrical works, construction of required offices, commissioning activities |
EPC |
Provision of Engineering, Procurement, Construction & Commissioning of Well Pads facilities at I/R, NC-115 and NC-186 |
Provide required tools, equipment and personnel to perform the engineering, procurement, contraction, pre-commissioning and commissioning of well pad facilities, 6” oil flowline, 12” and 18” trunklines, telecommunication and instrumentation, wellhead arrangements, skids installation, mechanical works, pigging facilities, cathodic protection, electrical and civil works, oil manifolds, tie- ins….etc at I/R, NC-115 & NC-186, El Sharara oil fields |
EPCC |
Turnkey Engineering & Design, Procurement & Supply, Construction and Installation of Furnace 202H001 of Block ELOU-AT-3 for JSC |
Provide all engineering expertise, tools, labor, equipment and materials to perform required designs, procurement, construction and Implementing of the Furnace 202H001 Furnace is General Contractor Contract Execution of Design Works N1/2010/OKS/3OCH |
EPC |
Provision of Engineering, Procurement, Construction & Commissioning of 66KV Overhead Transmission Line at El-Sharara Field |
Provide all expertise and resources to perform the engineering, OHTL rout, 168 towers foundation, 168 towers erection and stringing of cable from NC-115 to NC-186 |
EPCC |
Provision of Procurement and construction DOMEZ Sub Station 2*31.5 MVA |
Work comprise of providing equipment, laborers and materials to perform required earth works and the construction of substation building with all of its EMP works |
PC |
Provision of Procurement and Construction of 66KV Overhead Transmission Lines at NC-186 Fields |
Provide all required resources to procure, fabricate, erect and construct 129 towers of 66 KV foundations, 129 overhead transmission line towers and stringing of cable at NC-186 Fields. |
EPC |